Many school buildings in Southeast Michigan run HVAC on decades-old controls: pneumatic thermostats, schedules nobody can change, and classrooms that are too hot on one side of the hall and too cold on the other. Air Handlers Service Group has designed, installed and serviced commercial HVAC and building automation across Southeast Michigan since 1985. Here is how a controls upgrade can help.
Summer break and longer holidays are the best time for controls work. Plan in winter and spring so equipment and programming are ready when buildings empty out.
A good upgrade starts with a walk-through: what equipment is in place, which controls are failing, and which buildings or wings have the most complaints. From there, work can be phased by building or budget year.
We work on building automation and controls, rooftop units, boilers, chillers, VAV and VVT systems, unit heaters, and exhaust and make-up air equipment for schools and districts across metro Detroit. Call (248) 625-8913 or request a controls assessment.
Air Handlers Service Group · (248) 625-8913 · Locally owned since 1985